To add to what people have been reporting. I just talked with Mizuno and they said my order that was placed 12/26 (MP20 irons) is in parts pulled and will most likely ship next week. I was told my TT DG120 shafts were the back ordered parts and they received a shipment late last week and have been working through the back log. I also ordered a T20 wedge same day and was told that will likely ship this week.